Products UQDB Blind-Mate Sets UQ04 Hand-Push Sets Rack Manifolds CDU & Custom Manifolds Capabilities Industries Quality About FAQ Blog Contact Get a Quote
Integrators & Test Labs · Sample Programs

Sample bench today, line-down spares next quarter.

Integration lines and test labs run on small quantities with full paperwork: evaluation kits assembled to your interface list, MOQ from 50 pieces, samples shipping in 15 days — each set leak-tested on the same cells as production, with the report, seal and material declarations enclosed.

Sample Kit Table

Kits, contents and lead times.

Order by kit, not by SKU hunt — each row ships as one box with its documentation pack inside.

KitContentsLead time
UQDB evaluation kitblind-mate set in your dash size, mating-panel fixture spec, seal data sheet15 days
UQ04 evaluation kithand-push pair with ORB / barb ends, seal data sheet15 days
Multi-size interface kitone set each UQD02 / 04 / 06 / 08 for envelope and clearance trials15 days
Manifold samplesingle custom port-map manifold built to your drawing30–45 days after drawing approval
Seal sample packEPDM / FKM / FVMQ samples with the -40 to +200°C qualification span tableincluded with coupling kits
Production replenishmentMOQ 50 pieces, sizes mixed per release15 days standard
Packaging10×10×5 cm carton, 0.2 kg per coupling; manifolds trayed in foamwith every shipment
Termsquoted FOB, CIF or DDPper release
Inside The Box

What ships with every kit, and what lands in your qualification file.

Samples should behave exactly like production — same cells, same tests, same paperwork.

In every evaluation kit

1Leak-tested sets — 100% vacuum-decay testing on every coupling, results printed in the enclosed report.100%
2Gauged interface — every size checked against the OCP UQD Rev 1.0 envelope before packing.OCP REV 1.0
3Seal & material declaration — compound identity and wetted-material list per set.PER SET
4Class data sheet — Cv and rated flow per size (0.25–2.50 Cv, 0.55–4.7 GPM) plus temperature windows.PER SIZE
5Protected packaging — 10×10×5 cm cartons at 0.2 kg, foam-seated, labeled by dash size.10×10×5 CM

For your qualification file

1Cycle rating statement — 5000 mate/unmate cycles minimum, the OCP durability floor.5000× MIN
2Pressure floors — 100 psi working / 300 psi burst, verified per batch.100 / 300 PSI
3Cleanliness target — production runs to the ISO 4406 18/16/13 code.18/16/13
4FAI on request — ballooned first-article inspection with CMM dimensions for the bench sign-off.ON REQUEST
5No report, no kit — a batch without its paperwork never leaves the packing bench.HARD STOP
Test lab bench with UQD couplings wired into a liquid cooling test loop
Bench Reality

A qualification loop is a durability test for the coupling too.

Test benches mate and unmate thousands of times while integration lines do the same in miniature every shift — which is why the 5000-cycle OCP durability floor matters as much on the bench as it does in the rack. Dry-break valves keep the floor dry through all of it, with a 0.020–0.070 ml class spill budget per disconnect by size.

When the bench work turns into a program, the same parts continue: MOQ from 50 pieces, standard sets in 15 days, and a 48-hour DFM review for the custom manifolds the bench proved out. Nothing is resourced to a different production line after qualification.

  • 5000× — cycle floor your bench will never reach in one program
  • MOQ 50 / 15 days — from sample approval to production release
  • 48 h DFM — written review for custom manifolds before tooling
FAQ

Lab and integrator questions, answered with numbers.

Can one evaluation kit cover several coupling sizes?
Yes. The multi-size interface kit includes one set each of UQD02, UQD04, UQD06 and UQD08, so envelope, clearance and flow trials run in a single bench session. Kits ship in 15 days at MOQ from 50 pieces.
Do samples carry the same test evidence as production batches?
Yes. Samples run on the same cells as production and pass the same 100% vacuum-decay leak test, with the report, seal and material declarations included in the kit.
What is the path from samples to a production release?
Standard sets move from sample approval to MOQ-50 batches shipping in 15 days. Custom manifolds typically run 30–45 days after drawing approval, and a 48-hour DFM review starts either path.

List the interfaces on your bench. We will box the kit.

Evaluation kits quoted within 48 hours — MOQ from 50 pieces, samples ship in 15 days, FOB · CIF · DDP.