- Home
- Industries
- Integrators & Labs
Sample bench today, line-down spares next quarter.
Integration lines and test labs run on small quantities with full paperwork: evaluation kits assembled to your interface list, MOQ from 50 pieces, samples shipping in 15 days — each set leak-tested on the same cells as production, with the report, seal and material declarations enclosed.
Kits, contents and lead times.
Order by kit, not by SKU hunt — each row ships as one box with its documentation pack inside.
| Kit | Contents | Lead time |
|---|---|---|
| UQDB evaluation kit | blind-mate set in your dash size, mating-panel fixture spec, seal data sheet | 15 days |
| UQ04 evaluation kit | hand-push pair with ORB / barb ends, seal data sheet | 15 days |
| Multi-size interface kit | one set each UQD02 / 04 / 06 / 08 for envelope and clearance trials | 15 days |
| Manifold sample | single custom port-map manifold built to your drawing | 30–45 days after drawing approval |
| Seal sample pack | EPDM / FKM / FVMQ samples with the -40 to +200°C qualification span table | included with coupling kits |
| Production replenishment | MOQ 50 pieces, sizes mixed per release | 15 days standard |
| Packaging | 10×10×5 cm carton, 0.2 kg per coupling; manifolds trayed in foam | with every shipment |
| Terms | quoted FOB, CIF or DDP | per release |
What ships with every kit, and what lands in your qualification file.
Samples should behave exactly like production — same cells, same tests, same paperwork.
In every evaluation kit
For your qualification file

A qualification loop is a durability test for the coupling too.
Test benches mate and unmate thousands of times while integration lines do the same in miniature every shift — which is why the 5000-cycle OCP durability floor matters as much on the bench as it does in the rack. Dry-break valves keep the floor dry through all of it, with a 0.020–0.070 ml class spill budget per disconnect by size.
When the bench work turns into a program, the same parts continue: MOQ from 50 pieces, standard sets in 15 days, and a 48-hour DFM review for the custom manifolds the bench proved out. Nothing is resourced to a different production line after qualification.
- 5000× — cycle floor your bench will never reach in one program
- MOQ 50 / 15 days — from sample approval to production release
- 48 h DFM — written review for custom manifolds before tooling
Lab and integrator questions, answered with numbers.
Can one evaluation kit cover several coupling sizes?
Do samples carry the same test evidence as production batches?
What is the path from samples to a production release?
List the interfaces on your bench. We will box the kit.
Evaluation kits quoted within 48 hours — MOQ from 50 pieces, samples ship in 15 days, FOB · CIF · DDP.