Products UQDB Blind-Mate Sets UQ04 Hand-Push Sets Rack Manifolds CDU & Custom Manifolds Capabilities Industries Quality About FAQ Blog Contact Get a Quote
DryLink production hall with rows of CNC machining cells
Factory Tour · Shenzhen

One production line, from bar stock to packed carton.

DryLink couplings are not brokered between workshops — machining, testing and packing share one floor. Valve seats are ground to ±0.01 mm metres from the helium benches that prove them, and a standard batch walks out the door in 15 days with its report inside the carton.

Walk the Floor

Three stops a DryLink set cannot skip.

Every order — one box or one thousand — passes the same three stations. No express lane past the leak bench, no sampled release for small batches.

CNC machining cell turning 316L valve bodies for UQD couplings
Stop 01 · Machining

Bar stock to sealing-grade seats

3-, 4- and 5-axis centres turn 316L and brass bar into valve bodies and manifold cores. Valve seats are ground to the ±0.01 mm sealing tolerance in the same cell that will later watch them pass the benches — the machinist and the leak number answer to the same supervisor.

Inspection bench with CMM fixtures and helium leak test equipment for couplings
Stop 02 · Test

Every set past the leak bench

CMM first articles open the batch, then the leak benches take over: 100% of sets pass vacuum decay under 1×10⁻⁴ mbar·L/s, with helium mass-spectrometry verification at 5×10⁻¹² mbar·l/s detector class on leak-critical batches. Failures are quarantined by serial, never reworked in.

Packing station where tested UQD sets are bagged with their batch report
Stop 03 · Pack

Clean, bagged, documented

Release cleanliness is confirmed at ISO 4406 18/16/13 before bagging in the controlled area. Each set is foam-packed at 10×10×5 cm and about 0.2 kg, and the compiled batch report is the last thing into the carton before the tape.

Equipment

Four capabilities the floor is built around.

Cell 01 · CNC Machining

3/4/5-axis machining centres

316L, brass and aluminium on the same line, with valve seats ground to ±0.01 mm and 1U-pitch envelope parts held to the 44.45 mm class. Threads are cut and gauged to ORB per ISO 11926-3 before a part ever sees assembly.

Cell 02 · Leak Testing

Helium benches & vacuum-decay gates

Mass-spectrometry benches with 5×10⁻¹² mbar·l/s detector-class sensitivity stand behind a production acceptance order of about 1.4×10⁻⁶ atm·cc/s — while the inline vacuum-decay gate runs under 1×10⁻⁴ mbar·L/s on 100% of sets.

Cell 03 · Cleanliness Lab

ISO 4406 particle counting

Particle counts target the 18/16/13 code — 1300–2500 particles ≥4 µm, 320–640 ≥6 µm and 40–80 ≥14 µm per millilitre. Components are flushed, counted and bagged in a controlled area so the count survives to your loop.

Cell 04 · Assembly

Torque-controlled automated stations

Seal kits are kitted by compound lot, retainers are fastened under calibrated torque, and red-hot / blue-cold coding is verified per the OCP colour convention. Every set carries a serial range back to bar-stock heat and seal lot.

Capacity & Lead Time

What the calendar looks like from order to door.

Lead times are commitments against the same line you toured above — the 48-hour quote, the 15-day standard window and the 30–45-day custom build all run through those three stops.

ItemCommitmentNotes
Quotation48 hoursdrawings or photos are enough to start
DFM review48 hoursport map, Cv class, envelope and seal checks before tooling
Standard couplings15-day dispatchUQDB / UQ04 sets from MOQ 50 pieces
Custom manifolds30–45 daysafter drawing freeze and DFM sign-off
Sample batches15-day windowsame line, same report as production
MOQ50 piecescustom parts quoted separately
Unit packing10×10×5 cm · ~0.2 kgfoam-protected, serial-labelled per set
Export packingcarton + foam / trayprecision surfaces bagged in the controlled area
Trade termsFOB / CIF / DDPCIF insured at 110% under ICC(C) clause
Shipping originShenzhen, Chinayour forwarder of choice on FOB terms
Shipping documentsinvoice · packing list · CoCbatch report packed inside the carton
Re-orders15-day windowrepeat batches keep the serial-traced process

Walk the line yourself — or send the drawing first.

Factory visits and video walk-throughs are arranged with your quotation; standard sets dispatch in 15 days.