- Home
- Contact
Send the loop. Get numbers back in 48 hours.
A drawing, a photo or a paragraph about your loop is enough to start. Every enquiry gets a written answer within 48 hours — a bore-to-bore quote with lead time and test scope stated, or the specific questions that get you one. Standard coupling MOQ is 50 pieces.
The 48-hour quote form.
Fields marked * are required. What lands in our inbox is what you type here and any drawing you attach to a reply — the more loop detail, the fewer questions back. Standard sets quote straight against the OCP size classes, UQD02 through UQD08; custom manifolds enter the 48-hour DFM review the moment the drawing arrives.

The details behind the form.
The commercial half in plain sight, so purchasing can copy it straight into the requisition — and the same numbers reappear on every quotation document, so there is exactly one source of truth.
| Item | Detail | Notes |
|---|---|---|
| sales@ems-uqd.com | sales and engineering, both routed here | |
| Quote turnaround | 48 hours | written quote or the questions that get you one |
| MOQ | 50 pieces | standard coupling sets; manifolds per drawing |
| Standard lead time | 15 days | UQDB / UQ04, test and docs included |
| Custom lead time | 30–45 days | after drawing freeze and DFM sign-off |
| Trade terms | FOB / CIF / DDP | CIF insured at 110% under ICC(C) clauses |
| Payment | Wire transfer (T/T) | deposit + balance before shipment on first orders |
| Working hours | Mon–Sat · 8:30–18:30 | GMT+8; enquiries answered in order received |
| Languages | English / Chinese | drawings in PDF, STEP or IGES |
| Location | Shenzhen, China | export hub; FOB collection or our carriage |
Three questions that speed up a quote.
What should an RFQ include to get a 48-hour answer?
Can I start with samples instead of a production order?
Do you work under NDA?
Prefer to talk it through first?
Email engineering directly — attach the loop diagram, the drawing, or just a photo of the port you need to match. The 48-hour clock starts either way.