DryLink UQD & UQDB quick disconnects · rack manifolds
Rendering: a dark desk seen from a shallow angle with a coupling, a socket and a hose end laid out on the right, the left of the frame left clear

RFQ · Classification · Sample plans

Contact DryLink — Talk to a Coupling Engineer

Four ways in: the full RFQ, three fields for the spec sheet, a video audit, or one classification question. Both are answered in one business day.

Request spec sheet
Reply time · this site's commitment 1 business day
Classification split · public rulings 8481.80 / 7307.92 valved / valveless
RFQ length · this form 7 fields

Four ways in

4 channels · RFQ · spec sheet · audit

RFQ form

Drawings (2D or 3D), annual volume, destination country. Seven fields, one reply, and the only path here that produces a quote. A phased rollout goes through project support, which opens a file instead.

Spec sheet dialog

Three fields: work email, company, and the target interface or rack standard. No drawing needed, and the same one-page reply comes back.

Video audit

Bookable, and the walk-through includes the test bench live on camera, so a remote team sees the station itself.

Export questions

Classified per shipment rather than per catalogue page, because the code follows the configuration. The split is below.

US and EU inquiries are answered inside their own working day.

>

Samples

Prototype-first · cross-mating · lead time

Prototype-first

A T1 lot is issued before any production commitment, so fit and seal are confirmed on parts, not on a projection.

Cross-mating

Cross-mating samples are available, so a mixed-brand pair is checked on your own bench before the BOM is frozen.

Classification

Sample shipments are classified by the same split as production, so a sample arrives under the heading the volume will. per US CBP ruling NY K81592

Lead time

Sample lead time is confirmed at order, against the drawing in the RFQ — quoted for your part, not a catalogue line.

Rendering: a macro of coupling samples lying on a printed drawing, the samples and the drawing lines filling the frame
Cut to the drawingrendering, not a photograph
Rendering: a coolant drum tap with a stainless sampling probe and a length of clear tubing beside it
Run with the fluidchemistry decides the seal

Both images are renderings. The other half of the sample check is the fluid — see the coolant compatibility note.

Send the RFQ

Seven fields. One business day. One page of spec sheet back.

Rendering: a close-up of coupling cap rings and laser-marked flats, the markings themselves unreadable

Ring colour and body marking are asked for most often, and the form has no field for either — put them in the notes. What the marking means is on the FAQ page.

Both US and metric port pitches are available on manifolds.

Only need the spec sheet? Three fields instead

One business day · English quote plus a one-page spec sheet covering UQD02–08 and UQDB03–06, designed to the OCP UQD / UQDB specification

Visit, or audit on camera

Test-bench demo · remote audit · documents

Site visit

Bookable, and the visit programme includes a test-bench demonstration: the station the acceptance band is measured on.

Virtual audit

The same walk-through on camera, with the sample lot on the bench so a question about a part is answered against it.

Documents

Shipping documents are handled per export practice, so the paperwork matches the classification settled at the RFQ. China export practice

Action

Book the audit in the same reply as the quote: one thread, one owner, one revision behind both.

A row of CNC machines along a workshop bay, tool trolleys parked between them
Machining bayfirst station on the walk
An aluminium-framed test bench: a white-lined trough under a raised lid, a row of quick-connect fittings along its rail and a pressure gauge on the frame
Test benchsecond stop on the walk

The first is a generated image, the other two are photographs, shown as what a visit walks through. Test stations: the quality page.

Send the drawing. The reply is sized to it.


One business day · English quote plus a one-page spec sheet covering UQD02–08 and UQDB03–06, designed to the OCP UQD / UQDB specification

Back to the RFQ