120 kW-class · direct-to-chip
Beyond 100 kW racks
Air cooling stops here. Direct-to-chip takes over.
Book a rack-level BOM reviewWhere air cooling runs out
Five rungs · one limit · one transition
Air-cooled envelope
8–25 kW
per rack, the band air is designed for. industry-published benchmark
Air limit
~30 kW
above this, air cooling is not practical, whatever the aisle is built for. industry-published benchmark
Transition point
66 kW
an intermediate multi-node configuration, still on the liquid side of the line. industry-published benchmark
Top of the ladder
120 kW
fully direct-to-chip liquid cooled, per rack. industry-published benchmark
Installed estate
10–30 kW
still the mainstream density; facilities above 30 kW are rare. That gap is the retrofit question. industry-published benchmark
What a leak costs
Outage cost survey · 2025
Share of respondents reporting a six-figure outage. industry-published benchmark
Roughly one in three, in the same survey. industry-published benchmark
Outages above one million dollars are documented, not hypothetical. industry-published benchmark
Dripless couplings and a leak-test discipline are the half of this risk that can be specified on a purchase order.
When the rules arrive
Efficiency limits · date · measured band
2026-07-01
PUE ≤ 1.2
Germany: new data centres, from commissioning. industry-published benchmark
EU proposal
1.3 / 1.4
draft limits split by climate, colder member states tighter. industry-published benchmark
Measured
1.02–1.05
PUE band reported for liquid-cooled facilities. That is why liquid is a regulatory answer, not only a thermal one. industry-published benchmark
What that means for the parts
Loop condition · interface · fluid
Supply
17–27 °C is the recommended coolant temperature entering the cold plate. industry-published benchmark
Rack density
10–20 kW per rack is the common figure; HPC installations above 50 kW are the upper reference. industry-published benchmark
Interface
UQD panel-mount couplings, UQDB blind-mate couplings and a rack manifold, with port pitch matched to the rack standard. designed to the OCP UQD/UQDB specification
Fluid
Inhibited propylene-glycol loop chemistry of the PG25 class, per the specification's own reference set.
Port pitch
EIA 42U–52U and the ORv3 rack standard are both supported; the pitch changes, the coupling does not.
What goes into a review
Market access · owner review · clause mapping
Preparation is per destination market. A document set that covers one market does not cover the next one.
BOM review
Where does your rack land on this ladder?
Send the rack power per node and the interface you are planning against. Planning is done for 10–20 kW racks with coolant entering at 17–27 °C (industry-published benchmark), and the reply is a BOM review rather than a catalogue page.
Book a rack-level BOM review One business day · English quote + a one-page spec sheet