DryLink UQD & UQDB quick disconnects · rack manifolds
Rendering: a CDU service face with manifold blocks and coupling banks across one panel

UQD02–08 · second-source programmes

Second source, same test gate

Spec-first components for CDU and liquid cooling programmes.

Request the OEM qualification pack
Rated-flow ΔP band · industry-published benchmark 25–150% of rated flow
CDU market CAGR to 2030 · industry-published benchmark 19.0% per year
Supply concentration · industry-published benchmark Top-5 share of UQD supply

How you would test us

Three gates · before any market number

Gate 1 · ΔP

25–150%

pressure drop measured across that share of rated flow, at documented flow points rather than at one point. industry-published benchmark

Gate 2 · cross-mating

Interchange

plugs and sockets of a second source have to mate with parts already in service. That interchange is the precondition, not the bonus.

Gate 3 · reports

Clause map

the report is mapped to specification clauses one by one. A single pass mark on the cover is not a result.

Rendering: five test-bench units shown as one composite sheet, two across the top and three below

Looks identical, fails the test. That is the risk a second-source programme is set up to close. And the reason this screen comes before the market story.

The shape of the market

Two published views · kept separate

$1.131B → $4.162B 2023 → 2030, a CAGR of 19.0%. industry-published benchmark
$2.54B → $7.38B 2026 → 2034, a CAGR of 14.3%. industry-published benchmark

Two research houses, two shapes of one curve. Plan capacity against the band, not against a single point.

Supply

UQD supply is concentrated in the hands of a few suppliers. That concentration is where the interchange requirement comes from, not from us. industry-published benchmark

Rendering: eight stainless blind-mate couplings of ascending size arranged as four pairs on a near-black ground

A second source is judged on the parts it can put beside the first source's parts: same size family, same bore ladder, same interface.

Who carries the fluid risk

Reference fluids · compound level · change control

Spec reference fluids

DOWFROST LC 25 and JEFFCOOL ISF-25, the two inhibited propylene-glycol reference fluids named in the specification, of the PG25 class. They are named in the standard as its compatibility baseline; naming them here is a technical reference, not a partnership. per the OCP UQD specification

Seal compound level

Compatibility is verified compound by compound: EPDM, FFKM and the rest. It is not asserted for a material family as a whole. industry practice

Change control

Replacing a seal compound requires the compatibility work to be redone and the file updated. A swap without that re-verification is not offered. process capability

Fluid compatibility is a programme, not a statement about a material. Ask for it by compound and by fluid, and keep the answer on file with the batch.

What a programme receives

Curve data · traceability · cross-mating · benchmark

Cv / ΔP curve

Documented curve data at the flow points, so the selection and the flow budget are read off the same sheet. industry practice

Lot traceability

Traceability at batch level, so a programme audit can be answered at your site rather than in a summary. process capability

Cross-mating

Cross-mating test records travel with the batch they belong to. process capability

Benchmark discipline

The top of this market helium-tests every coupling and publishes a flow figure 25% above the OCP community standard. It is quoted here as the bar, not as our number. industry benchmark

Rendering: the interior of a CDU with the pump body and hose runs visible
Rendering: a CDU outlet bank, a row of coupling ports with trunk pipes rising behind them
Outlet bankInterface density at the panel
Rendering: a CDU faceplate carrying a half-inch port pair, braided hoses dropping toward the floor
Panel interface1/2 in pair through the faceplate
Rendering: a half-inch plug and socket drawn apart, the wider bore making both bodies read broad
Spares basisPlug and socket, interchangeable

Files for the destination market

Per market · version watch · pack contents

Per destination market Regulatory files are maintained market by market. One market's set does not stand in for the next one's.
Version watch The merged draft specification (v2.0.1, 2025-04) exists; version changes are tracked as they are published. Its draft values are not quoted here.
Pack contents Drawings, a test plan and a one-page spec sheet. The three documents a qualification file is built from. designed to the OCP UQD/UQDB specification

Qualification files are read by two different departments, engineering and sourcing. The pack is built to answer both without a second round of questions.

OEM qualification pack

Which gate does your programme start at?

Tell us which of the three gates your qualification starts with and we return the matching pack. Capacity planning here is done against the 19.0% CAGR curve (industry-published benchmark), not against a single published point.

Request the OEM qualification pack One business day · English quote + a one-page spec sheet